Rte 123 (Chain Bridge Rd) TO I-495 Capital Beltway
The survey regarding potential transportation safety, operations and bicycle/pedestrian improvements along Route 7 (Leesburg Pike) between Route 123 (Chain Bridge Rd.) and I-495 (the Capital Beltway) is complete.
The study focus is to assess operations and safety data in the study area and identify improvements that can be implemented in conjunction with the Rt 7 widening proposed for BRT from International Dr to I-495, with focus on the Rt 7 transition section at International Dr. Targeted Rt 7 improvements N. of InternationalDr. may be considered. The study will develop a cost-effective preliminary design concept that will accommodate the BRT alignment as well as congestion, safety, and bike/ped improvements, and a validated estimate to support a funding application. The BRT alignment segment along International Dr. will not be part of this effort.
Fairfax County Department of Transportation
District Lead: Rahul Trivedi
Lead Consultant: Eric Mongelli
PHASE | DATES | TASKS |
---|---|---|
Phase 1 | August 2021 – September 2021 | Problem Diagnosis/Brainstorm Alternatives |
Phase 2 | October 2021 – March 2022 | Stakeholder/Public engagement and feedback |
Phase 3 | March 2022 – July 2022 | Investment strategy cost estimation and refinement |
Last updated: May 23, 2024